Order the block.

How We Work
Pick the path that matches what you have.
01 Our Soil Standard
Quote
50% holds the run
We press
We ship

Balance due before pickup or before the truck. 50% is not negotiable.

02 Your Soil Coming — extra step is the test
You send it
We test
50% holds the press
We press
We ship

Test fee first. We will not press until the deposit is in. Balance before pickup or before the truck.

03 Inventory on hand
You ask
We confirm by email
50% holds the pallets
We ship

Nothing is claimed to be on hand. Availability is confirmed by email before any deposit. Balance due before pickup or before the truck. 50% is not negotiable.

04 On your site / 10K+ Not a ship path
Your dirt
We test
50% before we mobilize
We press on site

Test first. We do not move the plant on a handshake.

Wall takeoff

Poke the numbers. Estimate only — not a quote and not a rate sheet.

312
Blocks
5
Pallets (est.)
$936
Materials (your $)
$450 SAMPLE
Freight
$693
50% hold
280 sf
Net wall
Central Texas lane · quoted with takeoff
Net 280 sf · face 0.97 sf/block · raw 288 · +8% waste · 72 / pallet (est.)

Estimate. Not a quote. Email parabellumconstructors@gmail.com with this takeoff. Sample freight so you can poke. Not a rate sheet. Materials $ is YOUR what-if, not a published Parabellum price. 50% hold is on the quoted total.

Parabellum Constructors
Send the takeoff. We answer by email.